NDT – Phils., Inspection Services Corporation

EXPLORE
On February 11, 2025, NDTPI conducted a comprehensive Visual Inspection at Pagbilao Energy Corporation (Aboitiz Power – Therma Luzon Inc.) in Isla Grande, Pagbilao, Quezon.
 
Our Certified Inspection Engineers (API 653/510/570, CSWIP-PAUT/WI 3.1, PCN-ECT) meticulously assessed the Pressure Vessels and Piping Systems of the plant’s three (3) generating units, ensuring compliance with industry standards and operational integrity.
 
💡 Key Highlights:
✅ Thorough Inspection – Ensuring the structural integrity of critical components
✅ Expert Assessment – Conducted by highly qualified inspection engineers
✅ Strategic Recommendations – NDTPI presented a detailed report and tailored the NDT inspection plan to the Plant’s Operations Transition Team, guiding the next steps for optimized reliability and performance.
 
🔗 Partner with NDTPI for advanced inspection solutions that keep your operations running safely and efficiently!